Kleiberei First call
Independent renovation advice · Berlin

A healthy home in an old building, without the expensive mistakes.

We guide your renovation from the first big decisions through the quotes to handover. Our focus is on natural, healthy materials: clay, lime and wood.

Free first call 30 minutes, no obligation. The first site visit is a flat €60.
Zwei Personen tragen auf einem Gerüst Lehmputz an einen Deckenanschluss an
The Natural Nest — Applying clay plaster where the wall meets the ceiling. On site, 2021.
Our own experience as the client
10+flats we renovated ourselves, with our own money
2015we have owned and managed buildings in Berlin since then
Cellar to roofRisers, district heating, structural work in the cellar and the roof: as the client on our own buildings
How we help

Most people come to us with one of these questions.

“We’ve bought an old flat that needs work, and we’re out of our depth.”

Does the layout work, or is there a better one? Do you even need an architect? Which materials suit this flat? We work through these questions with you before you spend anything.

Get your bearings

“We can’t find a builder, and we don’t know whether to hand the whole job to one firm.”

One main contractor is easier and usually dearer. Separate trades cost less, but someone has to keep the sequence and the dates under control. We’ll tell you which makes sense for you, and get quotes from the firms we work with.

Find the right firms

“We have several quotes and no way to judge them.”

Different line items, different specifications, wide gaps in price. We compare the quotes and check them for gaps, so you don’t get hit with extras later.

Get your quotes checked

“There’s a musty smell, and I don’t want to just paint over it.”

First we work out where the damp is coming from: a cold bridge, a leak, too little ventilation. No plaster fixes the cause. Then we look at whether lime or silicate would suit you, since both are strongly alkaline and make it harder for mould to take hold, and where clay makes sense.

Find the cause
Before & after

The same spots, before, mid-build and afterwards.

The first two rows are from The Natural Nest, the third from Natural Nest Reloaded. The middle step matters to us: that is where we looked before anything was decided.

The living room

Derselbe Raum vorher, mit Teppichboden und Heizkörper unter dem Fenster
Before: carpet over dry screed
Wohnraum während der Bauphase mit Gerüst und frischem Lehm-Unterputz
On site: clay base coat on every wall
Fertiger Wohnraum mit Blick von der neuen Galerieebene
After moving in: the same room, seen from the new gallery

The floor

Zurückgeschlagener Teppich und eine Öffnung im Trockenestrich
Before: carpet pulled back and a hole cut in the dry screed to see what was underneath
Geöffneter Fußboden mit Hanfschüttung zwischen den Balken und Hanffilz darüber
Build-up: loose hemp between the joists, hemp felt over the top, then larch boards
Fertiger Boden, Detail am Übergang von Terrazzo zu Kiefernholz
Finished: pine boards, here where they meet the terrazzo

The bay-window room

Erkerzimmer vorher, ockerfarbene Wand und Laminat
Before: ochre walls, laminate
Abgezogene Wand, unter der Tapete kommt der alte Putz zum Vorschein
In between: wallpaper off, the wall checked
Fertiges Erkerzimmer mit hellen Wänden und neuem Parkett
After: clay paint on the walls, new parquet, the original box windows refurbished
Free first call

Thirty minutes by phone or video. By the end you’ll know whether a site visit is worth it.

Projects

Our own building sites, with the figures and the mistakes.

A selection from more than ten flats of our own. Each one also says what went wrong.

Fertiger Wohnraum im Natural Nest mit Treppe zur Galerie und offener Küche

The Natural Nest

2021 · 40 m² · Lehmputz, Hanfdämmung im Boden, Kiefernboden

Damp from the cellar had made the flat all but unliveable. We changed the layout, put in a gallery level, rebuilt the bathroom and plastered every wall with clay.

To do it, we opened the floor up and rebuilt it from the joists. The layers — hemp, larch, pine — are in the second row of photos above.

Hemp insulates about as well as mineral wool, but it takes damp up and gives it back instead of holding it against the timber. Over a damp cellar, that is what counts.

Our mistake

We started in winter. Clay needs warmth to dry, so we hired dehumidifiers nobody had budgeted for. We no longer start a clay job between November and March.

See the whole project →
Fertiges Zimmer im Natural Nest Reloaded mit neuem Parkett

Natural Nest Reloaded

2023 · 60 m² · Lehm-Silikat-Streichputz, Eichenparkett, alte Holzfenster aufgearbeitet

Mould in the shower, a kitchen covered in grease, broken laminate and under it a carpet glued firmly onto chipboard. The chipboard was still sound, so we reused it. The air inside was far too humid.

To choose the parquet, we built our own scoring model. The oak parquet we laid scores 74 out of 100 in it.

Our mistake

We took the walls for clean too soon. Nicotine and old wallpaper paste bled yellow through the clay paint. It took four coats at first; with the right preparation it would have been two.

See the whole project →
Schlafraum im Colorful Nest mit Kachelofen und farbigem Raumteiler

The Colorful Nest

2019 · 120 m² · Elektrik, zwei Bäder, Küche, Böden und Türen aufgearbeitet

Our first big project. We rewired the whole flat, built two bathrooms and a new kitchen, and had the old floors and doors sanded and repaired rather than ripped out. The tiled stove, the hexagonal floor tiles and the herringbone parquet all stayed.

The unusual part

We had a joiner build the room dividers and the beds instead of buying furniture. Built-in pieces solve things in an old flat that shop-bought furniture can’t: walls that aren’t square, awkward room depths, nowhere to put anything. They also give the place a character of its own.

Fast fertiger Stampflehmboden im Keller, jemand prüft die Trocknungsrisse

The Clayground

2025 · Kellerraum · Stampflehmboden aus Lehm, Sand und Stroh

One side of the floor sat a good deal higher than the other. We dug the clay ourselves, drove it over in a van, passed it down through the cellar hatch bucket by bucket, then mixed it with sand and straw and tamped it down.

Worth knowing

It took a month to dry and clear cracks opened up. Both are normal and get worked over afterwards. If you don’t know that, it looks like damage.

Fertige Lehmwand im Abendlicht

The Clay Wall

2025 · eine Wand · zwei Tage · rund 100 € Material

A single wall in our own coworking space, finished with a clay top coat over smooth old plaster. It was left untreated, with no paint and no sealant.

For a one-off question like this we charge by the hour, at €80. It doesn’t always have to be a whole renovation.

Worth knowing

Clay won’t bond to smooth old plaster. We ruled out straw reinforcement and keying the surface, and ended up with a primer of marble powder and marble grit, which gives the clay something to hold on to.

Independence

Advice on old buildings is rarely independent.

Most people who give it earn from what they recommend. That doesn’t make their advice wrong, but it does make it one-sided.

The builder

Paid for the work

They often give sound advice, but they recommend what they install themselves. And they usually arrive once the layout, the sequence and the materials are already fixed, which is after the decisions that move the most money.

The builders’ merchant

Paid for the materials

The advice there is often helpful and technically sound, but it is always for a product on their own shelves. Whether it suits the rest of the job, and what it all adds up to, is somebody else’s problem.

Us

Paid only for our time

We don’t build and we don’t sell materials. So what we recommend is what suits your flat and your budget, not what we’d make money on. And we put you in touch with firms we’ve worked with on our own sites.

Services and prices

Three steps. You can stop after any one of them.

All prices include VAT.

1

First call

Thirty minutes by phone or video. We listen, ask a few questions, and say at the end whether a site visit is worth it or whether you can handle this without us.

free
2

Site visit

We look at the walls, the floors, the damp and the fabric of the building, and give you our first read and some ideas on the spot. Afterwards you know what’s possible, roughly what it costs and what to leave alone. The first visit takes about an hour and costs a flat €60, travel included. If it takes longer, we charge the extra time at €80 an hour.

60 €flat fee for the first visit, travel included. Credited if you go ahead with us.
3

After that: by the hour, or all the way through

For one-off jobs, like checking a quote or confirming a material choice, we charge by the hour with no commitment.

Seeing it through covers everything in the next section. In the trade it’s called construction supervision, or acting as the client’s representative. We charge for it by the hour too, and estimate the time up front so you know what to expect.

80 €an hour, with an estimate up front
In detail

What seeing it through involves.

Before work starts
  • A survey on site: substrate, damp, the fabric of the building
  • A materials plan: what suits your flat and what doesn’t
  • Layout and room ideas where a change is worth making, with architects from our network
  • The order the trades come in, and a schedule that holds
  • A budget range and a cost estimate before the first quote arrives
Awarding the work
  • A scope of works, so the quotes can actually be compared
  • Quotes from the firms we work with
  • Comparing quotes and checking them for gaps, including ones you already have
  • Reading the contract before you sign and telling you what’s missing
While the work runs
  • Coordinating the trades and the dates
  • Site visits and quality checks
  • Recording defects and chasing them until they’re fixed
  • Attending the handover, and standing in for you if there’s a dispute
What we don’t do ourselves

We don’t design heating, ventilation or heat pumps, and we aren’t licensed to issue energy certificates or subsidised energy assessments. Building services engineers and accredited energy experts do that. We’ve worked with both, and we bring them in when your project needs them.

Materials

Why clay, lime and wood.

We use these materials not as a matter of principle but because in an old building they usually behave better. Alongside them come plant-fibre insulation such as hemp, where a floor or a wall needs insulating.

Kalkputz im Streiflicht
Lime plaster
Frisch aufgezogener Lehm-Unterputz mit Kammzug
Clay, freshly applied
Fertig geglättete Lehmoberfläche mit Lichtschalter
Clay, smoothed and finished
Hanffilz auf einer Schüttung aus Hanffasern
Hemp felt over loose hemp
Eichendiele mit Ast und Maserung
Oak board

They handle moisture

All three take moisture out of the air and give it back again. In old walls, which are rarely well insulated, that often decides whether mould appears in a cold corner. Lime is also strongly alkaline, which makes it harder for mould to take hold.

The premium is smaller than you’d think

Per square metre, clay plaster costs more than gypsum. Across a whole renovation it matters less, because the biggest line is labour and that is much the same either way. We’ll work the difference out with you before you decide.

They aren’t right everywhere

Clay has no business in a shower. Lime doesn’t get on with gypsum-based backgrounds. And clay needs time and warmth to dry, which gets expensive in winter. Where something else fits better, we’ll say so.

How we judge a material

We built our own scoring model.

Choosing the parquet for Natural Nest Reloaded, we couldn’t find a comparison we trusted. So we wrote to manufacturers, put questions to them, and built a model that scores a product in four areas. Every material decision has gone through the same four questions since.

  • 30 %Environment Raw materials, energy, emissions, durability and repairability
  • 30 %Health Harmful substances, effect on indoor air, safe handling
  • 20 %Transparency Certificates, clarity of manufacturer claims, greenwashing
  • 20 %Practicality Price, availability, suitability for DIY
About us

We have been our own clients since 2015.

Marc and Kai are brothers. Since 2015 we have owned apartment buildings in Berlin, managed them ourselves and renovated them piece by piece: water and waste risers, a district heating connection in place of individual gas boilers, a roof, a cellar with structural work. Alongside that, more than ten flats of our own, from the layout to the final invoice.

Along the way we have hired builders, paid architects and engineers, and argued with property managers, lawyers and agents. We have seen what a quote you shouldn’t sign looks like, how often work happens in the wrong order, and how much depends on someone turning up to look.

Architects, engineers and property managers make expensive mistakes too. Somebody has to check the work, chase it, and know what to look for.

In 2017 Marc and Kai also founded Happy Pigeons, a coliving and coworking house in Prenzlauer Berg, and ran it until 2025. It runs itself now; around forty people live and work there.

That is where we met Joel, and we have built together ever since: The Natural Nest, Natural Nest Reloaded, The Clayground. It is also where we first worked properly with clay, lime and wood, on our own walls, before we recommended them to anyone.

Kleiberei grew out of that. We deliberately don’t build ourselves, because the warranty belongs with the firm that does the work. Our job is to make sure that what stands there at the end is what was agreed.

Joel beim Auftragen von Lehmputz

Joel

Materials and workmanship, site supervision. Trained as a marine engineer, then moved into natural building; has built clay houses in Portugal and Australia. He reads what is already there, mixes test samples and is the first to spot a build-up that won’t work.

Marc mit dem Mischquirl im Kellerraum

Marc

Organisation, coordination, site supervision. Studied architecture, then co-founded Happy Pigeons. He keeps the dates, the trades and the firms together, and translates between you and the builders.

Porträt von Kai vor einer Altbaufassade

Kai

Planning, budget, quotes. Came from innovation management. He turns ideas into a sequence, compares quotes line by line and keeps the costs from drifting while the work runs.

Kleiberei is a trading name of Happy Pigeons GmbH, the same company that has run the coliving and coworking house in Prenzlauer Berg since 2017.

Free first call

You’ll be talking to one of the three of us, not to a sales team.

Common questions

The questions we get most often.

What does it cost to renovate an old flat in Berlin?

For a flat, the range at the moment is roughly €500 to €1,500 per square metre. A full renovation with new wiring, new pipework, a bathroom and floors usually lands around €800 per square metre.

The difference rarely comes from the materials. It comes from scope: how much has to go, how much can stay, and in what order the work happens. That is exactly what we sort out with you before the first quote arrives.

Do we need an architect?

Architects design, and they can submit planning applications. We do neither. What we do is make sure that what was designed and ordered is what actually gets built, and that the costs don’t drift.

For bigger changes to the structure we bring in architects from our network. Plenty of flat renovations need no architect at all, and we’ll tell you when that’s the case.

One main contractor or trade by trade?

A main contractor takes the coordination off your hands and gives you one person to call. That usually costs a mark-up, and you no longer pick the firms who do the work.

Going trade by trade is usually cheaper, but it needs preparation: a clean scope of works, a sequence that has been thought through, and someone keeping dates and handovers between firms under control. That is exactly our job.

Which one suits you depends on the size of the job, how much time you have and how closely you want to follow it yourself. We’ll work that out in the first call.

Do you do the design as well?

In part. We have plenty to say about layout and how the rooms work: what is worth changing, what is structurally possible and what it costs. For anything beyond that we bring in architects from our network.

On surfaces and colour we advise on the material and how it behaves, not on interior design. We’ll tell you which plaster suits your wall and how it will look, not which colour belongs in the living room.

Can your fee be subsidised?

No. KfW and BAFA only fund construction supervision when it is carried out by someone on the federal register of energy efficiency experts, and we are not on it.

If you are planning a subsidised retrofit you will need one of them as well. We work with energy efficiency experts regularly and can point you to some. Our part runs alongside theirs: material decisions, sequence, awarding the work and checking the site.

Do we need an energy assessor?

If subsidies are involved, yes. If not, usually not. We’ll tell you which applies to you in the first call.

We aren’t accredited energy assessors ourselves, and we don’t advise on heating, ventilation or heat pumps.

Is clay plaster actually worth it, or just more expensive?

It is more expensive, yes. The gap is smaller than most people expect, though: the material costs more, the work takes about as long, and labour is the bigger item.

The gain is in how it handles moisture, which you notice in a poorly insulated old wall. In a shower it has no business being there, and in winter the drying time makes it expensive.

When should we get in touch?

As early as you can, ideally before you start collecting quotes. The most expensive decisions are made right at the beginning: the sequence, the build-up, what stays and what goes.

If the quotes are already in, we can still check them and compare them. There is just less room to move by then.

Do you work outside Berlin?

We work mainly in Berlin and just outside it, because that is where we know the firms and can get to a site at short notice. Further out, the travel starts to add up. Ask anyway, and we will tell you honestly whether it is worth it for you.

Contact

Ask for a first call.

Tell us briefly what it’s about. We’ll reply by the next working day at the latest and suggest a time for the free first call.

Kleiberei
a trading name of Happy Pigeons GmbH
Erich-Weinert-Straße 78
10439 Berlin

hello@happypigeons.com

No cookies, no tracking, no third-party services. The form goes straight to our inbox.

Why “Kleiberei”?

The nuthatch is the only native bird that builds with clay.

It plasters the entrance to its nest hole until the fit is exactly right. “Kleiber” is also the old German word for the craftsmen who filled timber-frame walls with clay: one word for both the bird and the builder.

The four colour fields in our mark are earth pigments: ochre, umber, terre verte and caput mortuum. The same four tones come back across this page as backgrounds and margin notes.